Phase 2: Building 10 E-Wing Decommissioning Surveys
Bethesda, MD
Client
National Institutes of Health
Duration
June 2017 – January 2019
Project Overview
As part of the preparation for a major renovation within NIH’s Building 10, 3D Enviro conducted comprehensive hazardous material surveys across 14 floors of laboratories, offices, and patient care spaces. This crucial initial step was aimed at ensuring the safety and compliance of the renovation process.
Project Details
Challenge
Comprehensive Identification of Hazardous Materials
The scope of the project required a detailed assessment of a wide range of hazardous materials to facilitate safe demolition and renovation. Key challenges included:
Identifying research-related hazardous chemicals, lead-based paints, and asbestos-containing components in an active research hospital.
Ensuring all hazardous materials were accurately mapped to prevent health risks to construction workers and NIH staff during renovations.
Legacy Mercury Detection
A significant focus was placed on detecting legacy mercury, a prevalent issue in older laboratory settings:
Sensitive Measurements: The Ohio Lumex’s capability to detect minute quantities of mercury vapor ensured that all potential mercury contamination was identified before any demolition began.
Preventative Measures: Early detection allowed for specific remediation strategies to handle mercury safely and prevent exposure during subsequent construction activities.
Approach
Thorough Survey with Advanced Detection Technology
3D Enviro’s approach combined expert knowledge with advanced technology to address the challenges effectively:
Advanced Detection Equipment: The Ohio Lumex, a highly sensitive portable unit capable of detecting mercury vapor at extremely low concentrations, was used to identify legacy mercury spill areas.
Systematic Surveying: Conducted as areas were vacated, allowing for detailed, unobstructed assessments of the spaces.
Project Results
Results
Detailed Reporting and Safe Project Continuation
The completion of the hazardous materials survey provided NIH with critical data to proceed with renovations safely:
Detailed Reports: Each surveyed area was documented in reports that included findings, figures, and photos, outlining the extent and locations of hazardous materials.
Blueprint for Remediation: These reports served as blueprints for the necessary remediation and abatement efforts, ensuring all hazardous materials were addressed before demolition.
Conclusion
The Building 10 E-Wing decommissioning surveys exemplify 3D Enviro’s capability to conduct thorough and effective hazardous material assessments in complex environments. Our meticulous approach and use of cutting-edge technology ensured that the NIH could safely proceed with its renovations and comply with environmental regulations.
Planning a renovation in a sensitive environment? Contact 3D Enviro for comprehensive hazardous material surveys that ensure safety and compliance from start to finish.
Ready to Enhance Your Project’s Success?
If you’re facing environmental challenges or just want to ensure your project proceeds without interruptions, contact 3D Enviro today. Our team is ready to provide expert consultation and services tailored to your unique needs. Get in touch with us to see how we can help keep your project on track, safely and efficiently.
Contact Us
Lindsay Neese
Director of Business Development
434-771-0030
LindsayN@3DEnviro.us
Office Address:
9000 Rockville Pike building 9,
Bethesda, MD 20892
Mailing Address:
4774 Burnley Station Road
Barboursville, VA 22923