3D Enviro is your trusted provider for safe, compliant demolition services that remove hazardous materials like mercury, lead, asbestos, and PCBs. With expertise in regulatory compliance, we specialize in minimizing risks to your project, workers, and community.
Hazardous Material Demolition in Washington D.C. & Maryland
Trust 3D Enviro to Handle the Risks of Demolition—From Hidden Hazards to Regulatory Compliance





Protect Your Project and Your People
Hidden Dangers in Demolition
Demolition work can disturb unknown hazardous materials, posing risks to health, safety, and your project’s timeline. 3D Enviro specializes in the safe and effective demolition of spaces with legacy mercury spills, lead, asbestos, and other toxic substances. Without proper handling, hazardous materials can lead to:
- Unexpected exposure to dangerous substances like asbestos, mercury, or lead. It can also lead to these toxins getting into waterways which is an unexpected exposure.
- Health and safety risks for contractors and building occupants.
- Regulatory violations causing fines, shutdowns, and costly project delays in D.C. and Maryland.
If one of these things happen, it can cause:
- Health hazards from unknown contaminants.
- Potential project delays and added costs.
- Compliance issues with local and federal regulations.

Why Choose 3D Enviro for Hazardous Material Demolition?
With decades of experience in hazardous material demolition, 3D Enviro is the local leader trusted by government and commercial clients alike. Our team is trained in rigorous safety protocols and works with cutting-edge technology to identify and safely handle contaminants in high-stakes environments like laboratories, federal buildings, and industrial sites.

Industry-Leading
Expertise
Long-standing expertise in handling hazardous materials in sensitive environments.

Safe & Controlled
Demolition
Strategic demolition methods minimize contamination risks, protect workers, and prevent environmental exposure.

Reliable Project Management
& Compliance
Proven success in keeping projects on time and within budget by proactively managing health and compliance issues.
The High Cost of Inadequate Demolition Practices
Hiring an inexperienced demolition provider or failing to address hazardous materials like asbestos or mercury can lead to serious consequences. 3D Enviro ensures all hazardous materials are managed according to strict safety and compliance standards, preventing unnecessary health risks, financial penalties, and project delays.
- Health Risks: Exposure to substances like asbestos or mercury can lead to severe health issues, including respiratory diseases and neurological damage, impacting workers and building occupants.
- Legal and Financial Penalties: Violations of environmental and safety regulations come with steep fines. Below are potential costs associated with non-compliance:
- Project Delays: Unplanned contamination or regulatory non-compliance can halt projects, resulting in significant interruptions and unanticipated costs. Addressing violations or correcting hazardous waste issues mid-project can lead to months of delays and heavy financial burdens.
Example Demolition Violations to Avoid
Resource Conservation and
Recovery Act (RCRA) Violation
- Violation: Improper management of hazardous waste, including generation, transportation, treatment, storage, or disposal without a permit.
- Regulating Agency: EPA
- Maximum Penalty: $81,540 per violation, per day
Clean Air Act (CAA) Violation
- Violation: Non-compliance with air quality standards, such as unauthorized emissions of hazardous pollutants.
- Regulating Agency: EPA
- Maximum Penalty: $109,024 per violation, per day
Serious Workplace Violation
- Violation: A workplace hazard that could cause an accident or illness resulting in death or serious physical harm, which the employer knew or should have known about.
- Regulating Agency: OSHA
- Maximum Penalty: $15,625 per violation, per day
Willful or Repeated Workplace Violation
- Violation: Where the employer knowingly failed to comply with a legal requirement or acted with plain indifference to employee safety; or repeated the same or similar violation.
- Regulating Agency: OSHA
- Maximum Penalty: $156,259 per violation, per day
From Risk to Safety—3D Enviro’s Commitment to Transformation
When clients partner with 3D Enviro, they experience a seamless shift from risk and uncertainty to confidence and safety. Our expertise ensures every project meets health and safety standards, stays on track, and avoids costly delays.
- From Uncertainty to Confidence: Clients have peace of mind knowing hazardous materials are safely managed by industry experts.
- From Compliance Concerns to Peace of Mind: Our adherence to EPA, OSHA, and local standards removes the risk of fines and legal complications.
- From Costly Delays to On-Time Completion: With efficient demolition processes and compliance checks, projects are completed on schedule.
Our Safe, Proven 3-Step Demolition Process
3D Enviro follows a precise, proven process to ensure that demolition projects are handled with the highest standards of safety and efficiency. Our approach minimizes risks, ensuring a safe environment for your team and compliance with all regulatory requirements.

Assess
Our experts conduct a thorough site evaluation to identify hazardous materials and establish safe demolition protocols.

Demolish
Using selective demolition methods and specialized equipment, we safely contain and manage contaminants, minimizing exposure.

Clear and Verify
Post-demolition, we perform air quality and clearance testing to confirm that the area is safe, compliant, and ready for its next phase.
Our Safety and Compliance Standards
At 3D Enviro, safety and regulatory compliance are paramount in every project we undertake. We implement strict safety measures, advanced equipment, and protective protocols to safeguard both our team and our clients’ environments.
- Personal Protective Equipment (PPE): All workers wear full PPE, including respirators, gloves, and Tyvek suits, to prevent exposure to hazardous materials.
- Air Quality Monitoring: Continuous air quality assessments ensure contaminants are controlled and kept within safe levels throughout demolition.
- Compliance Audits: Regular audits ensure strict adherence to OSHA, EPA, and local environmental standards.
- Clearance Testing: Post-demolition testing guarantees that the site meets all safety and environmental criteria before project completion.
Challenge: Hazardous Material Abatement in Active Research Facilities
Case Study: Demolition & Remediation at the National Institutes of Health
The National Institutes of Health (NIH) required comprehensive hazardous material remediation across multiple high-security research and healthcare facilities. The project involved the controlled demolition of contaminated structures, including labs, pharmacies, and patient-sensitive areas, while ensuring uninterrupted operations.
3D Enviro’s Solution
Targeted Demolition & Hazard Abatement
Conducted selective demolition to safely remove asbestos, lead, and PCB-containing materials.
Regulatory Compliance & Documentation
Conducted real-time monitoring to ensure compliance throughout the project.
Project Management & Safety Assurance
Executed over 100 successful demolition and abatement projects within a two-year period.
Results
- Facilities cleared for reconstruction and continued use.
- Delivered efficient remediation with minimal project delays.

Environmental Integrity
Advanced techniques are used prevent the release of hazardous materials into the environment, ensuring long-term safety for our communities.

Sustainable Practices
We continually innovate to reduce the environmental impact of our work and ensure the safety of the ecosystems around project sites.

Future-Proof Solutions
Our thorough remediation practices prevent future liabilities and protect your business from legal and financial risks down the line.
Frequently Asked Questions
What hazardous materials can 3D Enviro handle during demolition?
Our team is qualified to handle a wide range of hazardous materials, including mercury, asbestos, lead, and PCBs, ensuring safe and compliant demolition across diverse environments.
How does 3D Enviro ensure compliance with D.C. and Maryland regulations?
With extensive experience and licensure in Washington D.C. and Maryland, 3D Enviro follows strict state and federal guidelines, conducting compliance audits and clearance testing on all projects.
What equipment is used to detect hazardous substances?
We use advanced tools like the Ohio Lumex RA-915+ mercury analyzer for real-time detection, along with other specialized equipment to monitor air quality and ensure safe containment during demolition.
Let Us Deliver a Safe and Compliant Demolition
Ready to Get Started?
When hazardous material demolition is required, you need a trusted partner with experience in both safety and compliance. Contact 3D Enviro for expert demolition solutions that protect your project, your team, and the environment.
Contact Us
Lindsay Neese
Director of Business Development
434-771-0030
LindsayN@3DEnviro.us
Office Address:
9000 Rockville Pike building 9,
Bethesda, MD 20892
Mailing Address:
4774 Burnley Station Road
Barboursville, VA 22923