Project Overview
The Celilo Converter Station, crucial for power transmission from Oregon to Los Angeles, relied on mercury arc valves to convert AC to DC until 2004. Given the historical use of mercury and its associated hazards, 3D Enviro was tasked with assessing and remediating extensive mercury contamination within the facility.
Project Details
Challenge
Historical Mercury Contamination
Routine maintenance and anode cleaning of mercury rectifiers had led to significant elemental mercury spills, posing health risks and operational challenges at the station. The project aimed to address these issues comprehensively to ensure the safety and efficiency of the power conversion processes.
Phase 1
Comprehensive Mercury Assessment
3D Enviro conducted a detailed assessment to:
Identify Contamination: Locate areas within the facility affected by mercury spills, and assess other hazardous materials such as lead-based paints and asbestos-containing materials.
Develop Remediation Plan: Outline necessary steps for effective mercury spill remediation and hazardous material management.
Phase 2 & 3
Remediation and Technical Oversight
With a robust plan in place, 3D Enviro oversaw the following key remediation activities:
Mercury Recovery and Abatement: Coordinated with BPA’s remediation contractor to recover visible mercury and implement comprehensive cleanup strategies.
Air Quality Monitoring: Conducted air quality and clearance monitoring to ensure the effectiveness of the remediation efforts.
Waste Management: Collaborated on identifying mercury-characteristic waste for proper disposal and managed the abatement of contaminated infrastructure, including sanitary pipes and HVAC systems.
Project Results
Results
Ensured Safety and Compliance
The meticulous approach taken by 3D Enviro resulted in:
Significant Reduction in Mercury Levels: Post-decontamination clearance levels were reduced to concentrations low enough to eliminate future employee exposure and environmental safety concerns.
Ongoing Monitoring and Reporting: Bi-weekly updates during the project provided transparency and allowed for adjustments in real time based on the data collected.
Conclusion
A Model for Effective Mercury Remediation
The project not only rectified the immediate contamination issues but also set a precedent for handling similar environmental hazards in industrial settings. 3D Enviro’s expertise in mercury assessment and remediation was crucial in returning the Celilo Converter Station to a safe operational state.
Interested in ensuring your facility meets environmental safety standards? Our team is equipped to handle complex environmental challenges, ensuring your operations are safe, compliant, and efficient. Contact 3D Enviro for comprehensive hazardous material assessments and remediation services.
Ready to Enhance Your Project’s Success?
If you’re facing environmental challenges or just want to ensure your project proceeds without interruptions, contact 3D Enviro today. Our team is ready to provide expert consultation and services tailored to your unique needs. Get in touch with us to see how we can help keep your project on track, safely and efficiently.
Contact Us
Lindsay Neese
Director of Business Development
434-771-0030
LindsayN@3DEnviro.us
Office Address:
9000 Rockville Pike building 9,
Bethesda, MD 20892
Mailing Address:
4774 Burnley Station Road
Barboursville, VA 22923