The 3D Method

Minimize Risks, Maximize Safety
The 3D Method for Hazardous Material Remediation

Your comprehensive plan to prevent delays, manage costs, and ensure compliance with EPA (40 CFR 262.11) and OSHA (29 CFR 1926.850e) standards—from start to finish.

Facing Unseen Risks During Your Project?

A Proven Four-Phase Method That Keeps Your Project On Track

safe-img-left

Our 4-Phase Approach to Hazardous Material Abatement

Phase 1

Historical Assessment & Site Survey

We begin with a detailed feasibility assessment, which is crucial for meeting EPA and OSHA standards. This phase covers:

  • Historical Research to review site history.
  • Interviews with key stakeholders.
  • Site Inspections to identify potential hazards.

By addressing risks upfront, we keep your project on track from day one.

Benefits:
  • Early detection prevents costly delays and regulatory setbacks.
  • Site-specific planning minimizes risk and ensures compliance.
Learn more about Phase 1 assessments
Phase 2

Facility Characterization Assessment

After the initial assessment, we conduct thorough sampling to detect contaminants. We use advanced technology to ensure accuracy:

  • Custom Sampling Plans for your site’s specifics.
  • Advanced Tools like the Ohio Lumex RA-915+ for mercury and X-ray fluorescence (XRF) for lead.
  • Accurate Analysis to provide a clear contamination profile.

This phase is critical for ensuring compliance with all relevant EPA and OSHA standards, avoiding potential fines and project shutdowns.

Benefits:
  • Data-driven remediation strategy tailored to your site.
  • Identifies hazardous materials before they pose a risk to workers.
Learn about Phase 2 assessments

“Our thorough pre-assessments mean no surprises for you—keeping your project on budget and on schedule.”

Lauren Neese TruslowCEO of 3D Enviro
Phase 3

Decontamination and Selective Demolition

Once hazards are identified, we implement targeted decontamination, removing contaminants safely while maintaining operational continuity:

  • Targeted Remediation using scientifically backed methods that protect your timeline.
  • Specialized Techniques including mercury-specific vacuums and tailored chemical treatments.
  • Expert Execution by our trained team following rigorous safety protocols. This phase strictly adheres to OSHA (29 CFR 1926.850e) guidelines, ensuring full compliance throughout remediation.
Benefits:
  • Safe and compliant removal of hazardous materials.
  • Minimal disruption to ongoing operations.
Learn about Phase 3 decontamination
Phase 4

Post-Decontamination Clearance Testing

Our final phase verifies that your site meets all regulatory and safety standards through independent third-party testing:

  • Comprehensive Testing by an industrial hygienist to confirm thorough decontamination.
  • Detailed Reporting documenting that the site is hazard-free and compliant.
  • Stand-Alone Service Option available when other providers perform remediation work. This critical final step delivers verified compliance with EPA, OSHA, and state regulations.
Benefits:
  • Documented compliance with all relevant regulations.
  • A clean, hazard-free environment for occupants and workers.
Learn about Phase 4 clearance testing
Proven Success in Every Phase

Our 3D Method isn’t just about following best practices: it’s about delivering exceptional results, time after time.

NIH E-Wing Decommissioning

We led the remediation of hazardous materials, including mercury and asbestos, over a 5-year, $21M project at the largest research hospital in the U.S.
We led the remediation of hazardous materials, including mercury and asbestos, over a 5-year, $21M project at the largest research hospital in the U.S., delivering the project on time and under budget.

SRLM Mass Excavation

Our team addressed unexpected asbestos and petroleum contamination mid-project without delays.
SRLM Mass Excavation: Our team addressed unexpected asbestos and petroleum contamination mid-project without delays.

Mercury Assessment & Abatement

Given the historical use of mercury within the Celilio Converter Station, 3D Enviro was tasked with assessing and remediating extensive mercury contamination.
Mercury Assessment & Abatement: Given the historical use of mercury within the Celilio Converter Station, 3D Enviro was tasked with assessing and remediating extensive mercury contamination.
Your Trusted Partner for Safe, Compliant, and Efficient Projects

We’re more than a service provider—we’re your environmental stewardship partner. Our commitment to precision, safety, and efficiency sets us apart from the competition.

  • Full-Service Approach: We handle every step from initial assessment to final clearance, so you don’t have to.
  • Cutting-Edge Technology: We use advanced tools like the Ohio Lumex RA-915+ for accurate detection, setting a higher standard for safety.
  • Certified Women-Owned Business: By working with us, you support diversity in the industry while meeting federal procurement requirements.

Ready to Take the Next Step?

Schedule a Consultation

Contact Us

Lindsay Neese
Director of Business Development
434-771-0030
LindsayN@3DEnviro.us

Office Address:
9000 Rockville Pike building 9,
Bethesda, MD 20892

Mailing Address:
4774 Burnley Station Road
Barboursville, VA 22923